ПРИЛОЖЕНИЕ НА ПРОЕКТНОТО КОНСУЛТИРАНЕ ПРИ УПРАВЛЕНИЕ НА ПРОГРАМИ ВЪВ ВИНЕНИЯ ТУРИЗЪМ

  • Автор : докторант Димитър Валентинов Кръстев
  • Дата : 19.12.2025

LTR RTL
0.04119
all = 0.04119 (100%)
LOADER = 0.00155 (3.76%)
 > session_start = 0.00011 (0.27%)
 > const_and_config_and_pages = 6.0E-5 (0.15%)
 > core_func = 8.0E-5 (0.19%)
 > core_class_base = 0.00011 (0.27%)
 > settings = 5.0E-5 (0.12%)
 > vmail = 7.0E-5 (0.17%)
 > db = 6.0E-5 (0.15%)
 > module_log = 4.0E-5 (0.1%)
 > files_and_images = 0.00063 (1.53%)
 > functions_site = 1.0E-5 (0.02%)
 > class_user = 3.0E-5 (0.07%)
 > class_cart_and_product = 0 (0%)
link_master.php = 2.0E-5 (0.05%)
CORE > frame.php = 0.03852 (93.52%)
 > SCRIPT = 0.03848 (93.42%)
 > ROOT functions_site = 2.0E-5 (0.05%)
_functions_after_script.php = 6.0E-5 (0.15%)
ROOT _functions_after_script.php = 1.0E-5 (0.02%)
_pages_data.php = 0.00024 (0.58%)
ROOT = 0.00078 (1.89%)
head = 0.0001 (0.24%)
echo_head() = 4.0E-5 (0.1%)
echo_body_top() = 0 (0%)
echo_body_bottom() = 1.0E-5 (0.02%)